Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Ono, Ayato; Takayanagi, Tomohiro; Sugita, Moe; Ueno, Tomoaki*; Horino, Koki*; Yamamoto, Kazami; Kinsho, Michikazu
JAEA-Technology 2021-044, 53 Pages, 2022/03
The 3-GeV rapid cycling synchrotron of Japan Proton Accelerator Research Complex (J-PARC) uses a large number of electromagnet power supplies in order to manipulate a high-intensity beam of 1 MW. These devices have been specially developed to meet the requirement to achieve acceleration of the 1-MW proton beams. Because J-PARC has been in operation for 10 years, we have to replace many parts and equipments due to failures caused by age-related deterioration. J-PARC accelerator system supplies the beams for many users, and we have to recover it as soon as possible when a trouble occurs. Therefore, if the trouble can be prevented before it happens, reduction of the user beam time can be minimized. Furthermore, it enables us to reduce additional work for operators. Maintenance is important to keep the equipments in a normal state, and makes it possible to extend the life of the equipments by detecting and maintaining the faulty parts and the aged deterioration parts at an early stage. Since all the devices requires the maintenance, there are a wide variety of maintenance methods. Some works are carried out by the J-PARC members, and some are performed by outsourcing. Ensuring safety and protecting workers are the most important issues in maintenance work. Therefore, J-PARC has rules for safety work. All workers in J-PARC have to learn and follow the rules. In addition, various ideas are being considered to enable safe and efficient work by devising ingenuity in each work. We also elaborate various ideas and processes for safe and efficient work according to the individual work conditions. In this report, we summarize the guideline and cautionary points during maintenance based on the actual case of maintenance and inspection work of the horizontal shift bump electromagnet power supply.
Nemoto, Miho*; Ebine, Noriya; Okamoto, Akiko; Hosaka, Yasuhisa*; Tsuzuki, Katsunori; Terada, Hiroaki; Hayakawa, Tsuyoshi; Togawa, Orihiko
JAEA-Technology 2021-013, 41 Pages, 2021/08
When North Korea has carried out nuclear tests, Nuclear Emergency Assistance and Training Center (NEAT) predicts atmospheric dispersion of radionuclides by using the WSPEEDI-II upon requests from Nuclear Regulation Authority (NRA) and submits the predicted results to NRA in cooperation with Nuclear Science and Engineering Center (NSEC). This is a part of the activity of NEAT supporting the Japanese Government in emergency responses. The WSPEEDI-II automatic calculation system specialized for responses to nuclear tests by North Korea was developed by NSEC and was used for responses to three nuclear tests from February 2013 to September 2017. This report describes the transfer and installation of the calculation system to NEAT, and the subsequent maintenance and operation. Future issues for responses to nuclear tests are also described in this report.
Ono, Ayato; Takayanagi, Tomohiro; Ueno, Tomoaki*; Horino, Koki*; Yamamoto, Kazami; Kinsho, Michikazu
JAEA-Technology 2021-005, 40 Pages, 2021/05
The 3-GeV rapid cycling synchrotron of Japan Proton Accelerator Research Complex (J-PARC) uses a large number of electromagnet power supplies in order to manipulate a high-intensity beam of 1 MW. These devices have been specially developed to meet the requirement to achieve acceleration of the 1-MW proton beams. State-of-the-art technologies are used to these devices. To achieve stable operation with few failures, and to prevent major troubles in the event of a failure, it is necessary to maintain the performance of the devices under the appropriate and accurate management strategy with an enough understanding of its characteristics. However, since the specification and function of each device is different respectively, and it is also produced by different manufacturer, we have to maintain adequately according to the structure, configuration and features of the apparatus. There are typically three major stages in the maintenance works. First, "Daily inspection" is constantly performed to monitor the status of the equipment during operation and check for any errors or abnormalities. Second, "Routine maintenance" is carried out weekly, monthly, or yearly to fix the errors, or to replace the parts that are deteriorated. Third, "Troubleshooting" is conducted to recover from sudden failures. In this report, we will introduce the specific contents of "Routine maintenance", "Daily inspection", and "trouble case" based on the experiences of the electromagnet power supply group. In particular, we will report the work management methods, including ideas for facilitating recovery work. We will also summarize the important points of a matter that does not depend on the configuration, structure, and characteristics of the equipment.
Tsuruga Comprehensive Research and Development Center
JAEA-Technology 2019-007, 159 Pages, 2019/07
This report summarizes the history and achievements of the prototype fast breeder reactor Monju. The development of Monju started in 1968 as a prototype reactor following the experimental fast reactor Joyo. The development covers all the activity related to the fast reactor; plant design, mockup tests, construction, operation, and plant management. This report summarizes the history and achievements for 11 technical areas: history and principal achievements, design and construction, operation test, plant safety, core physics, fuel, plant system, sodium technology, materials and mechanical design, plant management, and trouble management.
Shimazaki, Yosuke; Yamazaki, Kazunori; Iigaki, Kazuhiko
Hozengaku, 18(1), p.16 - 20, 2019/04
no abstracts in English
Department of Research Reactor and Tandem Accelerator
JAEA-Review 2017-027, 142 Pages, 2018/01
The Department of Research Reactor and Tandem Accelerator is in charge of the operation, utilization and technical development of JRR-3 (Japan Research Reactor No.3), JRR-4 (Japan Research Reactor No.4), NSRR (Nuclear Safety Research Reactor), Tandem Accelerator and RI Production Facility. This annual report describes the activities of our department in fiscal year of 2015.
Noguchi, Yuto; Maruyama, Takahito; Ueno, Kenichi; Komai, Masafumi; Takeda, Nobukazu; Kakudate, Satoshi
Fusion Engineering and Design, 109-111(Part B), p.1291 - 1295, 2016/11
Times Cited Count:2 Percentile:19.57(Nuclear Science & Technology)This paper reports the impact hammer test of the full-scale mock-up of ITER Blanket Remote Handling system (BRHS). Since the BRHS, which is composed of the articulated rail and the vehicle manipulator which travels on the rail deployed in the vacuum vessel, is subjected to the floor response spectrum with 14 G peak at 8 Hz, evaluation of dynamic response of the system is of essential importance. Recently impact hammer testing on the full-scale mock-up of the BRHS was carried out to verify the finite element method seismic analysis and to experimentally obtain the damping ratio of the system. The results showed that the mock-up has a vertical major natural mode with a natural frequency of 7.5 Hz and a damping ratio of 0.5%. While higher structural damping ratios is predicted in a high amplitude excitation such as major earthquake, it was confirmed that the experimental natural major frequencies are in agreement with the major frequencies obtained by elastic dynamic analysis.
Takamatsu, Kuniyoshi
Hihakai Kensa, 65(5), p.207 - 210, 2016/05
In our study, we focused on a nondestructive inspection method by cosmic-ray muons which could be used to observe the internal reactor from outside the RPV and the CV. We conducted an observation test on the HTTR to evaluate the applicability of the method to the internal visualization of a reactor. We also analytically evaluated the resolution of existing muon telescopes to assess their suitability for the HTTR observation, and were able to detect the major structures of the HTTR based on the distribution of the surface densities calculated from the coincidences measured by the telescopes. Our findings suggested that existing muon telescopes could be used for muon observation of the internal reactor from outside the RPV and CV.
Yoshinaka, Kazuyuki; Abe, Sadayoshi
Gijutsushi, 27(6), p.4 - 7, 2015/06
In a reprocessing plant, some apparatuses are in severe corrosive condition, like exposure to boiling nitric acid. Safety functions, like fire prevention on organic solvent, are needed on some apparatuses. To maintain the apparatuses and functions, various inspections are performed. The features of the maintenance in high dose, are represented in experiences of remote operation. The way of decommissioning of Tokai Reprocessing Plant has been indicated last year. But importance of maintenance will not change, because the apparatuses for treatment of high level liquid waste will be used for long term. Continuing development of remote maintenance technology and contribution to decommissioning Fukushima Dai-ichi NPP are expected.
Noguchi, Yuto; Maruyama, Takahito; Takeda, Nobukazu; Kakudate, Satoshi
Proceedings of 23rd International Conference on Nuclear Engineering (ICONE-23) (DVD-ROM), 9 Pages, 2015/05
This paper reports the seismic analysis of the ITER Blanket RH system (BRHS) during blanket module handling operation. Since the BRHS, which is composed of the articulated rail and the vehicle manipulator, which travels on the rail deployed in the vacuum vessel in the toroidal direction, has various configurations and the rail system has flexibility, evaluation of dynamic response of the system is of essential importance. Via parameter sensitivity study on position and posture of the vehicle manipulator, the most unfavorable configuration for each component of the BRHS has been specified by the modal and spectrum analyses with the global BRHS FE model. Then using the quasi-static equivalent loads on the individual components obtained by the global BRHS seismic analysis, the structural verifications of the structural members of the BRHS have been carried out with detailed partial FE models. The system seismic resistance of the BRHS to a safe shutdown earthquake was confirmed.
Fast Breeder Reactor Research and Development Center, Tsuruga Head Office
JAEA-Review 2014-030, 138 Pages, 2014/08
The prototype fast breeder reactor Monju has accumulated technical achievements in order to establish the fast breeder reactor cycle technology in Japan using the operation and maintenance experience, etc. This annual report summarizes the primary achievements and the data related to the plant management in Monju during fiscal 2013.
Nishimura, Akihiko; Terada, Takaya; Takenaka, Yusuke*; Furuyama, Takehiro*; Shimomura, Takuya
Proceedings of 22nd International Conference on Nuclear Engineering (ICONE-22) (DVD-ROM), 6 Pages, 2014/07
Since 2007, JAEA has been developing laser based technologies of structural health monitoring. The FBG sensor made by femtosecond laser processing will be the best candidate. To make the best use of the heat resistant characteristic, the FBG sensor was embedded in metal mold by laser cladding. A groove was processed to the surface of a SUS metal plate. We used a QCW laser to weld a filler wire on the plate. A series of weld beads perfectly formed a sealing clad on the groove. Though the FBG sensor was buried tightly, no degradation on the reflection spectrum was detected after the processing. The FBG sensor could detect the vibration of the plate caused by impact shocks and audio vibration. The reflection peak of the FBG sensor under laser cladding condition was shifted to be 6 nm. We demonstrated that the corresponded temperature derive from the reflection peak shift reached 600 degrees in heat shock experiments. The installation procedure of a FBG sensor using a portable laser cladding machine was described.
Nishio, Satoshi; Omori, Junji*; Kuroda, Toshimasa*; Tobita, Kenji; Enoeda, Mikio; Tsuru, Daigo; Hirose, Takanori; Sato, Satoshi; Kawamura, Yoshinori; Nakamura, Hirofumi; et al.
Fusion Engineering and Design, 81(8-14), p.1271 - 1276, 2006/02
Times Cited Count:20 Percentile:78.77(Nuclear Science & Technology)The design guideline for the blanket is decided to meet the mission of the DEMO plant which is expected to use technologies to be proven by 2020 and present an economical prospect of fusion energy in the operational time of the reactor. To moderate the technological extrapolation, the structural material of reduced activation ferritic steel (F82H), ceramic tritium breeder of LiTiO and neutron multiplier of Be are introduced. To improve the economical aspect, the coolant material of the supercritical water with inlet/outlet temperatures of 280/510C, coolant pressure of 25 MPa is chosen. Resultantly the thermal efficiency of 41% is achieved. To obtain higher plasma performance, MHD instabilities suppressing shell structure is adopted with structural compatibility to the blanket structure. To meet higher plant availability requirement (more than 75%), the hot cell maintenance approach is selected for the replaceable power core components.
Takatsu, Hideyuki; Konishi, Satoshi*
Purazuma, Kaku Yugo Gakkai-Shi, 81(11), p.837 - 902, 2005/11
Technology research and development issues, other than Breeding Blankets and Structural Materials, nesessary to be developed toward a fusion DEMO plant are introduced. Taking five critical technologies (Divertor, Superconducting Magnets, Tritium System, Heating and Current Drive system and Remote Maintenance System), target specifications and current status of technology research and development are outlined.
Oka, Kiyoshi
JAERI-Research 2004-009, 225 Pages, 2004/07
In the present paper, I describe the necessary approaches and elemental technologies to solve the issues on the system integration of the typical robot systems for maintenance in the nuclear fusion facility and rescue in the accident of the nuclear power plant facilities. These robots work under the intense radiation condition and restricted space in place of human. In particular, I propose a new approach to realize the system integration of the robot for actual use from the viewpoints of not only the environmental and working conditions but also the restructure and optimization of the required elemental technologies with a well balance in the robot system. Based on the above approach, I have a contribution to realize the robot systems working under the actual conditions for maintenance in the nuclear fusion facility and rescue in the accident of the nuclear power plant facilities.
Morimoto, Yuichi*; Ochiai, Kentaro; Sato, Satoshi; Hori, Junichi; Yamauchi, Michinori*; Nishitani, Takeo
Fusion Engineering and Design, 69(1-4), p.643 - 648, 2003/09
Times Cited Count:4 Percentile:31.59(Nuclear Science & Technology)no abstracts in English
Takada, Shoji; Takizuka, Takakazu; Kunitomi, Kazuhiko; Yan, X.; Minatsuki, Isao*
Dai-31-Kai Gasu Tabin Teiki Koenkai Rombunshu, p.55 - 60, 2003/06
no abstracts in English
Department of HTTR Project
JAERI-Review 2003-013, 98 Pages, 2003/05
The HTTR (High Temperature Engineering Test Reactor) with the thermal power of 30 MW and the reactor outlet coolant temperature of 850/950C is the first high temperature gas-cooled reactor (HTGR) in Japan, which uses coated-particle fuel, graphite for core components, and helium gas for primary coolant. The HTTR, which locates at the south-west area of 5000 m in the Oarai Research Establishment, had been constructed since 1991 before accomplishing the first criticality on November 10, 1998. Rise to power tests of the HTTR started in September, 1999 and the rated thermal power of 30 MW and the reactor outlet coolant temperature of 850C was attained in December 2001. JAERI received the certificate of pre-operation test, that is, the commissioning license for the HTTR in March 2002. This report summarizes operation, tests, maintenance, radiation control, and construction of components and facilities for the HTTR as well as R&Ds on HTGRs from FY1999 to 2001.
Obara, Kenjiro; Yagi, Toshiaki; Yokoo, Noriko*; Shibanuma, Kiyoshi
JAERI-Tech 2003-035, 107 Pages, 2003/03
no abstracts in English
Oka, Kiyoshi; Shibanuma, Kiyoshi
JAERI-Tech 2003-004, 57 Pages, 2003/03
Cesium is required in order to generate a stable negative ion of hydrogen in an ion source of the neutral beam injector (NBI), which is one of the plasma-heating devices for International Thermonuclear Experimental Reactor (ITER). After long time operation of NBI, the cesium deposits to the insulators supporting the electrode. Due to the deterioration of the insulation resistance, the continuous operation of the NBI will be difficult. In addition, the NBI device is activated by neutron from D-T plasma, so that a periodic removal and cleaning of the cesium on the insulators by remote handling is required. A study of the cesium removal scenario and device is therefore required considering remote handling. In this report, a cesium removal procedure and conceptual design of the cesium removal device using laser ablation technique are studied, and the feasibility of laser ablation is shown.